麻豆国产原创视频在线播放

  1. <p id="mefgm"></p>
    1. <td id="mefgm"><ruby id="mefgm"></ruby></td>
      1. <track id="mefgm"><s id="mefgm"><menu id="mefgm"></menu></s></track>
        1. 北京中天久業膜建筑技術有限公司
          Beijing Z&T Fabric Architecture Technology Co. Ltd

          Membrane Structure Engineering of air-film Comprehensive Sports Hall in Daxing Army

          項  目  介  紹  
           Project introduction

          該運動館位于北京大興營區西南角,采用三層保溫氣膜密閉系統,總長50米,寬38米,高13.5米。在氣膜館東側設置旋轉門和雙層互鎖密閉門與附屬配套用房相連接,并作為入館的主要出入口,并設置三個應急門作為應急使用,氣膜外敷斜向網狀鋼纜系統。外膜選用平岡匯鋒PVF高品質膜材,內膜使用環保PVC不透光膜材。

          Membrane Structure Engineering of air-film Comprehensive Sports Hall in Daxing Army
          The gymnasium is located in the southwest corner of Daxing barrack in Beijing. The air-supported membrane structure gym adopts a three-layer air sealing system, with a total length of 50 meters, a width of 38 meters and a height of 13.5 meters. A revolving door and a double-layer airlock door are set in the east side of the gym hall, which connected to the auxiliary rooms and serve as the main entrance and exit of the gymnasium. Three emergency doors are set for emergency use; the air-supported membrane structure is equipped with diagonal-mesh steel-cable system; the outer layer membrane is PVF high-quality membrane material made by Pinggang Huifeng,and the inner layer membrane is environmental friendly PVC opaque membrane material.

          竣工時間:2020年1月                       Completion time:  Jan. 2020
          建設地點:北京                            Construction site:  Beijing
          結構形式:充氣式                          Structure form:  Air-supported membrane structure
          膜 面 積:6500平米                        Membrane area:  6500 square meters
          膜材型號:匯鋒250T PVDF膜材               Membrane Material: 250T PVDF
          Mobile
          麻豆国产原创视频在线播放